Waterway Recovery Group (WRG):
Diger in action
Waterway Recovery Group (WRG):
Vegetation clearance
Waterway Recovery Group (WRG):
Volunteer learns to operate an excavator
Waterway Recovery Group (WRG):
Amber driving a dumper
Waterway Recovery Group (WRG):
Dumper in action
Waterway Recovery Group (WRG):
Repointing bridge
Waterway Recovery Group (WRG):
Canal Camp Volunteers
Waterway Recovery Group (WRG):
Compacting path
Waterway Recovery Group (WRG):
Edgings being put in
Waterway Recovery Group (WRG):
Wacker
Waterway Recovery Group (WRG):
Volunteers at work
Waterway Recovery Group (WRG):
Bridge part cleared
Waterway Recovery Group (WRG):
HB sign
Waterway Recovery Group (WRG):
David using a Wacker
Waterway Recovery Group (WRG):
Rachel pointing
Waterway Recovery Group (WRG):
Days end
Waterway Recovery Group (WRG):
David compacting
Waterway Recovery Group (WRG):
Adrian Instructing
Waterway Recovery Group (WRG):
Towpath repairs at Stainton
Waterway Recovery Group (WRG):
Jack and Connor on tea break!
Waterway Recovery Group (WRG):
Repointing bridges
Waterway Recovery Group (WRG):
Bridge 180
Waterway Recovery Group (WRG):
Pointing team
Waterway Recovery Group (WRG):
Margaret on the bridge repairs
Waterway Recovery Group (WRG):
Repointing bridge
Waterway Recovery Group (WRG):
Tom repointing bridge
Waterway Recovery Group (WRG):
Repointing bridge
Waterway Recovery Group (WRG):
Towpath before repairs
Waterway Recovery Group (WRG):
Bridge repairs
Waterway Recovery Group (WRG):
Pete clearing bywash