u18b404: A pair of West Tennessee B23-7s work the CSX interchange in front of the Depot at Humbolt.
u18b404: A pair of B23-7s lead West Tennessee's Humbolt Turn North on a rainy morning.
u18b404: The Humbolt Turn and its pair of B23-7s make a few moves at the yard in Jackson on a rainy Spring morning
u18b404: NKZV departs Newark for Zanesville with a pair of Super 7s and a SD40-2 up front and another Super 7 and a GP38AC on the rear.
u18b404: Trucks-N-Trains. Peterbuilts and GE B23-7s work side by side in Tennessee
u18b404: Pan Am departing Geneva... sounds like a 1970s flight iternary. Actually.... Its NS's H06-20 on the Finger Lakes Railway ready to head back to Gang Mills.
u18b404: H06-20 passes Southbound over Big Stream as it returns to Gang Mills from the Finger Lakes Interchange in Geneva.
u18b404: H06-20 heads North behind a pair of Pan AM C40-8s at Beaver Dams.
u18b404: Rock Island Rail GP38-2 4373 has just arrived back in Sumner, MS with the interchange from the CN while C40-8 2127 begins to receive a fresh coat of RI red & yellow
u18b404: Lhoist's train returns from the NS interchange with 1 car as it crosses Fall Creek. Fall
u18b404: 315 crosses the drawbridge at "RU" over the Black River on the B Line.
u18b404: ZVL-1 emerges from a short tunnel as it arrives in Cambridge behind a pair of B23-7Rs
u18b404: N21-03 takes empties to the Bailey Mine as it makes its way up the Manor Branch.
u18b404: ZVL-1 crosses the Muskingum River with a B23-7R on each end of the train to work industries on the West side of the river
u18b404: "Just In Time" N72-03 departs the Bailey Mine with a loaded coal train on the Manor Branch. We made it to this location in Time, PA with just enough time to catch this train led by a pair of CSX GEs
u18b404: ZVL-1 crosses the Muskingum River in Zanesville, OH with B23-7R 4096
u18b404: A Lhoist train returns from the NS interchange to the plant at Crab Orchard with just 2 covered hoppers.
u18b404: N617-02 heads lite down the grade on the Somerset Railroad to clear snow and ice from the rail. The power has just left the Niagara Branch and is nearing the Gulf Summit trestle.
u18b404: Train N617-02 consists of two big GE motors leading 109 loaded Somerset coal hoppers as they swing of the "Danielewicz" route and onto the old Hojack headed for the power plant in Somerset, NY.
u18b404: Q363 is passed by an intermodal train as waits outside of Frontier Yard for the Q393 to finish its work.
u18b404: N615-19 heads over the Erie Canal Northbound with 131 loads of coal for the Somerset power plant .
u18b404: N616 passes the approach signal at "SAN" as it heads East on the Lockport Branch headed for the power plant at Somerset.
u18b404: NYSW 4006 Attica,NY 1989
u18b404: SIJB has GE test units on the points as it heads South out of Salamanca, NY
u18b404: The last rays of light are vanishing to the West and a band of lake effect snow squalls hug the shore line of Lake Ontario to the North as T126-22 nears its destination on a frigid boxing day. The temperature never reached above 7 degrees as we followed t
u18b404: 309-20 prepares to depart Buffalo, NY only days before the 8099 would have an encounter with a large bolder near Pittsburgh causing it to be sidlelined for a couple years.
u18b404: The Southern heritage unit 8099 leads train 309-20 down the Bison Runner towards CP-Draw. A few days later this unit would hit a bolder near Pittsburgh, sidelining it for several years.
u18b404: Rail train 912-09 sits on the clean out track at Silver Springs after a long day of dropping rail to the West.
u18b404: Takin the siding at Silver Creek
u18b404: ZVL's pair of Super 7's pass through the flood gates at Cambridge, OH.