u18b404:
Two for Tuesday! ONTN will combo up with the job working ZFS before continuing South to Owosso.
u18b404:
ONTN heads South towards Owosso, MI with a real mix of EMD power on the headend after comboing its 2 units with 3 from a crew working ZFS in Ithaca, MI.
u18b404:
Great Lakes Central train OSTN heads for the Ann Arbor interchange in Osmer, MI. I was fortunate to catch one of GLC's former MRL SD35s leading.
u18b404:
Great Lakes Central ONTN has an impressive amount of their roster up front as it passes the old Woodard Furniture Company.
u18b404:
Great Lakes Central train OSTN, with SD35 383 leading, works the small yard in Owosso, MI before heading South.
u18b404:
Great Lakes Central train OSTN is led by a former Montana Rail Link SD35 as it pounds the diamond crossing the CN at Durand.
u18b404:
OSTN has dropped its interchange traffic for the Ann Arbor on the siding and prepares to head back North to Owosso.
u18b404:
GP38-2 395, SD35 386 & SD40-2 382 lead a Northbound GLC train out of Owosso, MI. Yes there are rails there somewhere.
u18b404:
GLC train ONTN rolls South through Elba with 5 EMDs for power, including a pair of EX-MRL SD35s.
u18b404:
ONTN has divvied up their power and is now bringing the rest of their train into town with SD40-2 382 in the lead. The 382 was built in PC 6262 and also served Conrail as 6262.