Tysasi: fastest 200 yet
Tysasi: A container freight waits for a signal just south of Powell Blvd
Tysasi: Construction continues on ORHF's new enginehouse
Tysasi: Shiny new bike path in a deceptively rural setting
Tysasi: Chugging up the Springwater Trail
Tysasi: Judd Road, after the initial climb, is quite pleasant
Tysasi: A solitary horse potters around in a field
Tysasi: Dark clouds and precipitous downgrades ahead
Tysasi: A #30 interurban bus sits at a store outside Estacada
Tysasi: Freshly resurfaced Faraday Road
Tysasi: Hydropower MLCM
Tysasi: Puddles and rock outcrops
Tysasi: The Memaloose Road (nfd 45, I believe) bridge
Tysasi: Checking that the Cateye cyclecomputer is more-or-less in sync with what the GPS tells me
Tysasi: The turnoff to Carter Bridge campground
Tysasi: bridge #1
Tysasi: Bridge #2
Tysasi: Whitewater just after the patch of sun moved away
Tysasi: A collection of gentle rapids
Tysasi: The sun shines down on my long climb up to Ripplebrook
Tysasi: Bridge #3 in the sun
Tysasi: Bridge #4
Tysasi: The Clackamas rumbles under the last of the bridges before the Ripplebrook ramp
Tysasi: Almost up to the Ripplebrook Ranger Station
Tysasi: Ripplebrook MLCM
Tysasi: Ripplebrook Ice Cream
Tysasi: Sailing downgrade next to the Clackamas River
Tysasi: New landslides, en passant
Tysasi: Pinned between the Clackamas & an unstable cliffside
Tysasi: The sun tries to burn through the clouds, with indifferent success