MTA C&D - EAST SIDE ACCESS: IMG_1615 2nd Ave PLC Panel
MTA C&D - EAST SIDE ACCESS: CS179 55th Street - Ruskin - 04-06-22 - Perform TVCS Local System Test - at the Lower Fan Room 402 area (2)
MTA C&D - EAST SIDE ACCESS: CS179 55th Street - OCC - 04-08-22 - Programing & perform LST of the ATC system - in DDC-9 cabinet at FPSS B03 HVAC Room 303 area (3)
MTA C&D - EAST SIDE ACCESS: CQ033 - 4-7-22 Installing conduit ,brackets and camera mount box on column E6D - CC
MTA C&D - EAST SIDE ACCESS: CQ033 - 4-6-22 Mobilizing equipment sitewide_FSE - CC
MTA C&D - EAST SIDE ACCESS: CQ033 - 4-4-22 Switch cleaning West of Qns. Blvd._WIP II -CC
MTA C&D - EAST SIDE ACCESS: CQ033 - 4-1-22 Installing camera boxes and conduits West of Qns. Blvd III - CC
MTA C&D - EAST SIDE ACCESS: CQ033 - 4-1-22 Installing camera boxes and conduits West of Qns. Blvd II - CC
MTA C&D - EAST SIDE ACCESS: CQ033 - 4-1-22 Installing camera boxes and conduits West of Qns. Blvd - CC
MTA C&D - EAST SIDE ACCESS: CQ033 - 04-21-22 - Cleaning (FSE), Testing and Locking (LIRR) SWs 607, 623, and 627 - EB (2)
MTA C&D - EAST SIDE ACCESS: CQ033 - 04-19-22 - Cleaning Out, Testing, and Locking Switches 503, 613, and 615 - EB (5)
MTA C&D - EAST SIDE ACCESS: CQ033 - 04-19-22 - Cleaning Out, Testing, and Locking Switches 503, 613, and 615 - EB (3)
MTA C&D - EAST SIDE ACCESS: CQ033 - 3-29-22 Adjusting volume on PA speakers just east of the toilet serv.build. - AC
MTA C&D - EAST SIDE ACCESS: CQ033 - 3-28-22 Welkin fixing the stand pipe ball drip_2 - EB
MTA C&D - EAST SIDE ACCESS: CQ033 - 3-28-22 Hand digging and installing the posts for the access road gate_3 - EB
MTA C&D - EAST SIDE ACCESS: CQ033 - 3-28-22 Hand digging and installing the posts for the access road gate - EB
MTA C&D - EAST SIDE ACCESS: TK 40 installing mesh cables
MTA C&D - EAST SIDE ACCESS: Tile 3124- Fixed flooring protection
MTA C&D - EAST SIDE ACCESS: Tile 3118 Zone 4 - JPP completion and demobilization for in contract maintenance on Chiller 2 in Chiller Plant_001
MTA C&D - EAST SIDE ACCESS: Tile 3113- Cleaning tape from floors in front of store front
MTA C&D - EAST SIDE ACCESS: TE in MER A3067 pulling in 4C 18AWG LSZH from ATC-44-4 panel through RGS conduits be terminated to the four water flow switches of HWSHWR and CWSCWR (2)
MTA C&D - EAST SIDE ACCESS: Post Shift Pics (15)
MTA C&D - EAST SIDE ACCESS: Post Shift Pics (7)