BV Ashok: MZL - KCG Pass.
Primal Madusanka: M2a 591 on Trial run at Maho in 22.06.2011
Primal Madusanka: S12 912 at Maradana in 11.07.2019
dwieky: klb kirim sarana kereta eksekutif jajakrta kota-surabaya pasar turi
Howard_Pulling: JR-West 201-77, Higashi-Yodogawa
BV Ashok: NSL - TPTY Special
ri.co: Train from Mandalay (20190717-171131)
Primal Madusanka: B1a 251 at Puttalam in 08.02.2014
Primal Madusanka: S9 861 at Ragama (No 3422 Colombo Fort-Chilaw) in 11.07.2019
Howard_Pulling: Nankai Electric Railway 50000 (5), Tengachaya
Howard_Pulling: JR-West 117-17 (E-05), Nakasho
BV Ashok: YPR - DEE Duronto Exp.
Howard_Pulling: Nankai Electric Railway 2043, Kaizuka
Howard_Pulling: Mizuma Railway 1008, Koginosato
Howard_Pulling: JR-West 225-5010, Rinku Town
Howard_Pulling: Nankai Electric Railway 50000 (1), Rinku Town
Primal Madusanka: S11 896 passing Ragama (No 3424 Colombo Fort-Chilaw) at 11.07.2019
bukhariatb: Low angle of C27 10 Steam Locomotive Collection at Taman Mini Transportation Museum
bukhariatb: Last exist on the railtrack trainset of KRL Ekonomi, Rheostatic Stainless Steel Electric train from local train floor of door with mid-low angle.
bukhariatb: Last exist on the railtrack trainset of KRL Ekonomi, Rheostatic Stainless Steel Electric train from local train with generally angle.
bukhariatb: Last exist on the railtrack trainset of KRL Ekonomi, Rheostatic Stainless Steel Electric train from south of Purwakarta station.
bukhariatb: Last exist on the railtrack trainset of KRL Ekonomi, Rheostatic Stainless Steel Electric train from south of Purwakarta station shunting signal.
bukhariatb: D 301 58 shunting JR 205 42F electric railway looks repainting process when i captured this moment in front of Balai Yasa Manggarai.
bukhariatb: Galunggung Rail Measure (KA Ukur Galunggung) long stand by several months at Cipinang Locomotive Depot.
bukhariatb: Double in one trainset of Light Rail Transit (LRT) Jakarta useful if weekend for bring many passengers than weekday during commercial testrun.
bukhariatb: CC 300 12 02 (CC 300 02) as first on CC 300 haul passenger train on history, when shunting replace his position at Bogor station before ready to Sukabumi for second times on that day.
bukhariatb: Last exist on the railtrack trainset of KRL Ekonomi, Rheostatic Stainless Steel Electric train from low angle on the track 5 Purwakarta station.
Primal Madusanka: W3 631 at Maligawattha in 30.06.2019
TheRailCruiser: BGKT WDP4D 40088 with 14853 Marudhar Express
Primal Madusanka: M11 950 on Passenger train (No 1172 Colombo Fort -Polgahawela) 1 in Ragama in 30.06.2019