spelio:
B3R49-37 Mary's photo of rockhole & constructed dam at "Balbinya"
InTheBush*:
Stone channels at Boondi Railway Dam
GavGTP:
Wivenhoe Dam (Flood release into Brisbane River) at 116% Capacity. All 5 gates were open. This water takes approx 48hrs to reach Brisbane CBD. - 12 days later it reached 190%
GavGTP:
Wivenhoe Dam (Flood release into Brisbane River) at 116% Capacity. All 5 gates were open. This water takes approx 48hrs to reach Brisbane CBD. - 12 days later it reached 190%
GavGTP:
Wivenhoe Dam (Flood release into Brisbane River) at 116% Capacity. All 5 gates were open. This water takes approx 48hrs to reach Brisbane CBD. - 12 days later it reached 190%
spelio:
B3R59-S03 at Warragamba Dam, or Guthega in Summer?
spelio:
An outback dam in SA