Angus Adventures:
Cut copper wires
Angus Adventures:
Begin wiring panels together (half hour)
Angus Adventures:
Insert and wire the bulkheads (ten minutes)
Angus Adventures:
Step 2: Inject white glue into seams
Angus Adventures:
Step 3: Remove copper wires (ten minutes)
Angus Adventures:
Applying Epoxy Fillets (one hour)
Angus Adventures:
Round the outside corners (twenty minutes)
Angus Adventures:
Hey, I'm a boat builder!
Angus Adventures:
Drape fiberglass over hull (one minute)
Angus Adventures:
Trimming cloth (ten minutes)
Angus Adventures:
Smoothing cloth (one minute)
Angus Adventures:
Pour Epoxy Over Cloth (ten minutes)
Angus Adventures:
Spreading the Epoxy
Angus Adventures:
Installing the Seats
Angus Adventures:
Fully sanded interior
Angus Adventures:
Gluing the Gunwales into Position (one hour)
Angus Adventures:
Install the twin bilge keels (one hour)
Angus Adventures:
Gluing on motor mount (fifteen minutes)
Angus Adventures:
Wiring (half hour)
Angus Adventures:
Motor installed
Angus Adventures:
Done! Time for adventures!