ntynesidetrains:
NTSR yard with 2 scheme members laying bricks to form the platform
ntynesidetrains:
Platform and loop construction
ntynesidetrains:
Constructing the loop at Percy Main
ntynesidetrains:
Southerly view of the former BR track leading under Metro line at Percy Main prior to building of 1st Percy Main station just beyond distant signal
ntynesidetrains:
North view of new track south of Rising Sun bridge (left of crane jib)
ntynesidetrains:
North view of new track south of Rising Sun bridge (behind crane jib). Roof of Stephenson Museum in centre horizon
ntynesidetrains:
Items being stored in yard at NTSR
ntynesidetrains:
East extension to main museum building
ntynesidetrains:
East extension to main museum building
ntynesidetrains:
Items being stored in yard at NTSR
ntynesidetrains:
East extension to main museum building
ntynesidetrains:
Track laying
ntynesidetrains:
Trackgang packing sleepers at Percy Main
ntynesidetrains:
Work in the yard
ntynesidetrains:
Pointwork
ntynesidetrains:
Landwork
ntynesidetrains:
Digging
ntynesidetrains:
Rising Sun Bridge
ntynesidetrains:
Rising Sun Bridge
ntynesidetrains:
Rising Sun Bridge
ntynesidetrains:
Shot blasting and painting the Rising Sun bridge
ntynesidetrains:
Railway construction
ntynesidetrains:
Railway construction
ntynesidetrains:
Land work
ntynesidetrains:
Land work at Percy Main
ntynesidetrains:
Land work at Percy Main
ntynesidetrains:
No.03078 with a works train
ntynesidetrains:
No.03078 with a works train
ntynesidetrains:
No.03078 with a works train
ntynesidetrains:
Crane loading materials