ntynesidetrains: NTSR yard with 2 scheme members laying bricks to form the platform
ntynesidetrains: Platform and loop construction
ntynesidetrains: Constructing the loop at Percy Main
ntynesidetrains: Southerly view of the former BR track leading under Metro line at Percy Main prior to building of 1st Percy Main station just beyond distant signal
ntynesidetrains: North view of new track south of Rising Sun bridge (left of crane jib)
ntynesidetrains: North view of new track south of Rising Sun bridge (behind crane jib). Roof of Stephenson Museum in centre horizon
ntynesidetrains: Items being stored in yard at NTSR
ntynesidetrains: East extension to main museum building
ntynesidetrains: East extension to main museum building
ntynesidetrains: Items being stored in yard at NTSR
ntynesidetrains: East extension to main museum building
ntynesidetrains: Track laying
ntynesidetrains: Trackgang packing sleepers at Percy Main
ntynesidetrains: Work in the yard
ntynesidetrains: Pointwork
ntynesidetrains: Landwork
ntynesidetrains: Rising Sun Bridge
ntynesidetrains: Rising Sun Bridge
ntynesidetrains: Rising Sun Bridge
ntynesidetrains: Shot blasting and painting the Rising Sun bridge
ntynesidetrains: Railway construction
ntynesidetrains: Railway construction
ntynesidetrains: Land work
ntynesidetrains: Land work at Percy Main
ntynesidetrains: Land work at Percy Main
ntynesidetrains: No.03078 with a works train
ntynesidetrains: No.03078 with a works train
ntynesidetrains: No.03078 with a works train
ntynesidetrains: Crane loading materials